Customization: | Available |
---|---|
After-sales Service: | Excellent After-Sales Service |
Rated Loading Capacity: | 5 Tons |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Proportional remote control, proportional solenoid valve (optional)
It can control the crane from a long distance and make the lifted objects move gradually.1, spider crane small size, large strength, high safety level, which is the general crane or crane can not match the machinery;
2, the birth of spider crane is to complete the glass installation work more efficiently, mini spider crane in the indoor, narrow space and narrow channel application is also very wide;
3, the spider crane's compact fuselage design means that work can be carried out indoors or in areas with limited space, and the spider crane's compact body can easily enter the construction site and reduce the cost of use;
4, spider crane small size, convenient transportation, a wide range of use in the curtain wall construction process, can be used for vertical transportation, lifting, etc;
5, in some places, the general crane can not enter, and the roof, indoor, shopping malls or densely populated places, the general crane has no way to run, and the miniature spider crane can easily complete the work;
6, spider crane used in airport, railway station, dam construction site and other building materials hoisting project, with the narrow flexible convenience, spider crane has been used in many municipal building construction operations, and help the construction personnel to solve a lot of trouble;
Q1: How is Spider crane maintained and maintained?
A1: The maintenance work to be done when the equipment is in operation is more, and daily inspection must be done after the end of the work every day;
A2: the driver is responsible for the routine maintenance of the operation, the daily inspection to do the main content of cleaning, lubrication transmission parts, adjustment and fastening work;
A3:in the operation process should always pay attention to see whether the equipment has abnormal sound, if there is abnormal sound to timely shutdown check;
A4: once a week test, in addition to the daily testing items, the weekly inspection is mainly responsible for the appearance, hook, pick-up device, wire rope and other use of the safety state, as well as its brake, clutch, emergency alarm are sensitive;
A5:in addition to the weekly inspection, we also need to carry out regular monthly inspection of the equipment, the lifting machinery of the power system, lifting mechanism, rotating mechanism state detection, if there are wear, deformation, cracks, corrosion of the parts must be replaced in time. As well as the electrical control system inside it, overload protection and safety protection devices are to be checked to see if they are reliable;